Is there a limit on the maximum FCR bid size?

In accordance with Article 156(6) of Commission Regulation (EU) 2017/1485, the volume of FCR that may be provided per unit is limited to a maximum of 5 percent of the Nordic synchronous area's FCR requirement.

Example: If the Nordic requirement for FCR-N is 600 MW and for FCR-D up 1450 MW, this means that a single unit may provide a maximum of 30 MW for FCR-N and 72.5 MW for FCR-D up.

Article 156(6) of Commission Regulation (EU) 2017/1485.