What is the maximum FFR capacity a unit is allowed to bid?
First and foremost, the size of the bids is limited to the prequalified capacity or the capacity specified in the procurement of the FFR volume.
Furthermore, there are technical limitations on how much capacity a unit or group may bid.
These are related to the “points of failure” which could, for example, be the connection point the unit is behind. 50 MW is the greatest FFR bid that a unit behind a single connection point can bid.
Read more in the technical requirements. (.pdf) Opens in a new window